Malmbjerg NPV Ladder

MOLY.TO Greenland Resources Inc. FS sensitivity curve, extrapolated at 160 · per diluted share

Project stage

Complete Underway Ahead
Molybdenum spot —/lb
→
Project NPV —US$B
→
NPV per share —C$
→
Market pays —× NPV
Moly US$/lb
Loading…
MOLY.TO C$
Loading…
USD → CAD
Loading…
Market cap C$M
Diluted share count × MOLY.TO price. Moves with the dilution slider.

Equity dilution to fund construction

25% dilution → 200.0M shares
0% — 150M today (135.2M out + options & warrants) 50% — 300M
Jump to

Your holding

Enter how many MOLY shares you own to value your position at each molybdenum price.
Shares you own

Value per share at 0.5× / 0.7× / 1.0× NPV

Spot slots into the ladder in price order and is flagged LIVE.

Measure upside and position value at
Moly priceUS$/lb After-tax NPVUS$ million 1.0× NPVC$ / share 0.7× NPVC$ / share 0.5× NPVC$ / share Trades atMOLY.TO ÷ full NPV Upsideat 1.0× NPV vs C$1.42
The NPV curve — two regimes, both editable

Below US$22.50/lb the model rides the 43-101 sensitivity table itself, which runs from US$13.50 to US$22.50 in 5% steps (US$323M up to US$1,921M). The eleven published points imply a step of US$177.6M per US$1/lb, remarkably straight across the whole range — the individual steps only wander between 173 and 181.

Above US$22.50/lb the study stops and the model extrapolates from its top point at a deliberately reduced US$160M per US$1/lb. That haircut off the in-study slope is the conservative choice, and it's the reason these figures sit below a naive straight-line projection — at US$34/lb it gives US$3,761M where extending the study's own 177.6 slope would claim about US$4,965M.

Dilution is expressed as a share of the post-raise count, not as a multiplier on today's. So 25% dilution means new equity is a quarter of the final register: 150 ÷ (1 − 0.25) = 200M shares. 40% gives 250M. That's the convention your sensitivity table uses, and it's the stricter reading — 25% "dilution" in the looser sense would only get you to 187.5M.

The 3% NSR is applied as a 6% cut to NPV. That's an approximation, but a good one: against the royalty-adjusted per-share figures it lands within C$5M at US$26, US$30 and US$36/lb alike. A royalty scales with revenue while NPV scales with price at a similar rate, so a flat percentage tracks it well over this range.

Cross-check. Set dilution to 25%, USD/CAD to 1.3800 and leave the NSR off: the 1.0× column reproduces the source spreadsheet exactly — C$17.1 at US$26, C$21.5 at US$30, C$28.2 at US$36.

Reading the table
  • Trades at — MOLY.TO's price divided by the full-NPV value per share in that row. A row reading 0.04× says the market is paying four cents for a dollar of modelled project value at that molybdenum price.
  • Upside — how far MOLY.TO would have to move to reach that row's value at the multiple you've selected, as a percentage of today's price. The chips above the table switch all of it between 0.5×, 0.7× and 1.0× NPV, because "upside" is meaningless without saying upside to what. Expect large numbers; a developer trading at a few cents on the modelled dollar produces four-figure percentages, which says as much about the market's risk discount as about the asset.
  • Your position — appears once you enter a share count. It's your shares × that row's per-share value at the selected multiple. Watch what the dilution slider does to it: your share count is fixed while the denominator grows, so moving 0% → 50% halves every figure in the column. You keep your shares and own less of the project.
  • Rows marked FS sit inside the study's own sensitivity range and don't rely on extrapolation at all.
Where the live numbers come from
  • Molybdenum — LME Molybdenum (Platts), month-2 close, day-delayed. This is the only molybdenum source: no second provider is substituted if it fails, because a spot oxide assessment sits several dollars away from the LME curve and quietly swapping one for the other corrupts the NPV. The LME settles once a day, so the value is cached for an hour and a refresh usually returns the same figure. If the fetch fails the tile turns red and holds the last good LME number until you overwrite it.
  • MOLY.TO — Yahoo Finance, delayed. Also trades as MOLY on Cboe Canada, M0LY in Frankfurt, GRLRF on OTCQB.
  • Newsflow — Google News RSS, two standing searches: one for the company and Malmbjerg, one for the metal. Refreshed every half hour. It is an unfiltered headline feed, not a curated one — small-cap miners attract promotional "stock alert" sites alongside real coverage, so check the publisher before you believe a headline. Company filings on SEDAR+ are the authoritative record.
  • USD/CAD — Frankfurter (ECB daily reference), with open.er-api as backup.

Browser security rules force the two scraped sources through public proxies, which are free and therefore flaky. A red dot means the fetch failed and you're seeing the last good number — typing over any tile overrides the feed until you clear it.